How many step to build plastic injection mold

Jun 16, 2020 Leave a message

                                                  Plastic injection mold work process
ITEMSTEPEXPLAIN
1Customer RFQ2D or 3D drawings, or the samples,even ideas.
2QuotationIssue quotation within 2 days (Preliminary DFM if necessary.)
3POGot the PO with release the final drawing.
4DFMDFM report within 2 days, Proactive comments like draft analysis, parting line,Undercut, Slider/Lifter structure, Cooling, Venting , Gateing, Ejection, Cavity/lifter sticking, short shot posibility, Thin steel conditions, so on.
53D Mold design3D mold design with all components details.
62D Mold designSubmit 2D mold design assemblely drawing with BoM within 3 days.
7Order steel According 2D drawing BOM to purchas steels.3-5 days for cavity/ Core steel and components , 2 weeks for mold base and Hot runner.
8Mold buildingRough machining, Heat Treatment, final CNC, Wire Cut, EDM, Polish, Mold Fitting, Assembly, Will update project schedule every friday with machining photos.
9T1 Normally about 4 weeks from 3D mold desgin approved to T1,also welcome on-sit mold trial.
10  T1 reportsProvide 10 shots parts for free with mold test video, mold trial report,sample dimentions and sampling parameter.
11  T2 or T2+Fix customer's T1 comments and mold trial report, then have mold test.
12Sample Approvaled and production orderMake sure samples approved, and mold movement smoothly.
13Injection processIn injection process, according to the standard operating procedure to inspect the goods in each one hour. 
14Assemblely and packageMake sure assemblely and packaging met customer requriement.
15After-sales servicesMake sure goods met the customer needs.