What are the components of the production cost of mould manufacturing

Jul 06, 2018 Leave a message

What are the components of the production cost of mould manufacturing?

Roughly speaking, the cost distribution is as follows:

Cutting 65%

Workpiece material 20%

Heat treatment 5%

Assembly/adjustment 10%

It also clearly shows the importance of good metal cutting performance and good overall cutting solution to the economic production of the mould.