How to install the moulds

May 04, 2018 Leave a message

                        How to install the moulds?

   The assembly of the template and mold is cleaned in a fixed plane.

   Adjust the operation button of the injection molding machine to adjust position.

   To cut off the injection molding machine operation power supply.

   To check whether the clamping plate is fastening and fastening for mold closing.

   Inspection, test module specific peripheral attachment (valve, switch, oil mouth) whether all, the movement is flexible.

   To install the mould crane.If there is not enough tonnage of the hoisting device, the mould can be separately hoisted.Then, when the two parts are fixed, the guide column and guide sleeve are used as the benchmark.

   The thread hole of the fixed visual template of the mold is fixed with the position of the mold, and the available screws can also be used to tighten the pressure plate.The distribution of each fastening point should be reasonable, the fastening force of each nut should be even.As for the fastening of large mold, it is necessary to coordinate with the supporting device of the mold when the mold is fixed.